Index of /sda1/Works/Document/Training/LC Training/UPLC training note/New Acquity UPLC copy to engineer/S-3/SM_Maintenance_Video/


../
1_SM_Installing the needle as.mpg                  27-Jan-2005 02:12     15M
2_SM_Replacing the wash Syrin.mpg                  27-Jan-2005 01:50     19M
3_SM_Replacing the Sample met syringe.mpg          26-Jan-2005 21:14     18M
4_SM_replacing the inject valve.mpg                27-Jan-2005 02:32     14M
5_SM_replacing sample loop.mpg                     27-Jan-2005 02:38     16M
6_SM_Removing the needle asse.mpg                  27-Jan-2005 02:07     18M
SM_Calibrate needle z axis.mpg                     27-Jan-2005 02:20     12M
SM_Performing Sample Syring Leak Test.mpg          27-Jan-2005 01:44      8M
SM_Priming the Wash Syringe.mpg                    27-Jan-2005 01:55      7M
SM_characterizing the seal.mpg                     27-Jan-2005 02:26     13M
SM_performing the wash syringe leak test.mpg       27-Jan-2005 02:01      8M
SM_priming the sample meter.mpg                    26-Jan-2005 21:20      7M